Saturday 29 October 2011

First day of filming- Thursday 27th October

We had a tough day of filming because it was raining, this was a minor set back, but we were still determined to keep working. Our time was spent mainly on creating some base tracks and some flash back scenarios. We took this time to do some further planning and practice what shots we might use.

Here are test shots of Thursday's filming:

All of our filming was done in Brick Lane.

At college picking up the equipment

At college picking up the equipment

Waiting at the bus stop to go to Brick Lane

Waiting at the bus stop to go to Brick Lane

Taking pictures of our location

Going to our location

Picture of our location

Another picture of our location

Finding a suitable spot to film

Picture of one of our actors in our music video (Kudiwa)

Doing a handheld shot of Kudiwa walking down the street

Reviewing the footage

Setting up the camera and taking precaution as it was raining

One of our location for filming because of the graffiti 

More graffiti

Filming one of the base tracks 

One of our scenes in the music video

Reviewing the footage

One of our locations where we filmed

Filming a scene of them two walking down the street

:) Bricklane!!

No comments:

Post a Comment